BC STORIES
NewsAlert: Drenching rains sever routes on B.C.’s Lower Mainland from Interior
Drenching Rains Disrupt Travel in British Columbia’s Lower Mainland
Rain warnings are in effect as atmospheric river systems impact the region, severing key routes.
Summary
- Much of British Columbia’s south coast and southern Interior are under rain warnings.
- Severe weather has led to the closure of several routes connecting the Lower Mainland to the Interior.
- Authorities are urging caution as conditions may worsen with ongoing rainfall.
Article Body
British Columbia is experiencing significant rainfall as a series of atmospheric river systems move through the province. Much of the south coast and parts of the southern Interior are currently under rain warnings, prompting concerns about travel safety and infrastructure.
The heavy rains have resulted in the closure of multiple routes that connect the Lower Mainland to the Interior. This disruption is affecting both personal and commercial travel, with authorities advising residents to avoid non-essential travel until conditions improve.
Emergency services are on alert, monitoring the situation closely. They are prepared to respond to any incidents related to flooding or road hazards that may arise from the ongoing weather conditions.
Residents are encouraged to stay informed through local weather updates and heed any advisories issued by authorities. The situation remains dynamic, and further developments are expected as the rain continues.
BC STORIES
Home Practice Restricted for Nurse Following Patient Complaint
BC nursing regulator restricts Kamloops nurse Lori Chern from practicing at home after alleged inappropriate behavior with a patient during an assessment.
Home Practice Barred During Investigation
Registered nurse Lori Chern has been ordered to stop practicing from her home following a summary protection order issued by the BC College of Nurses and Midwives on Nov. 4. Chern operates RN Collaborate out of her home, a health and wellness practice focused on men over 40.
While her home-based operations are prohibited during the ongoing investigation, the regulator is allowing her to continue nursing duties at Princeton General Hospital and Dr. Helmcken Memorial Hospital in Clearwater.
Details of the Patient Complaint
The regulatory action stems from an August complaint detailing an incident during a medical evaluation requested for an RCMP assessment. According to the regulator’s decision, Chern sat next to the man on her couch during a blood pressure check. The decision states that “[d]uring the blood pressure assessment, (Chern) began caressing the complainant’s right arm.”
The filing notes that Chern complimented the man’s heart rate, blood pressure, and physical condition, saying he “seemed to have the health of an 18-year-old and making other gestures and remarks that appeared flirty.” She subsequently discussed the importance of sex for men’s self-regulation and allegedly offered to engage in sexual activity with him.
Regulator Reviews Text Evidence
When the patient turned down the offer, “(Chern) indicated the complainant was free to text or call them outside of work to meet up for sex,” according to the decision summary. The complainant provided text messages to the regulator, which stated the messages “largely conformed to the assertions in the complaint.”
BC STORIES
Restored Mill Creek Pathway In Kelowna to Offer Boosted Flood Protection and Wildlife Habitat
The City of Kelowna has finished construction and planting along a 650-metre stretch of Mill Creek, improving flood protection and fish habitat.
Restoration Milestone Reached at Parkinson Recreation Park
A major milestone has been reached in Kelowna’s efforts to build a healthier and climate-resilient waterway along Mill Creek. The City of Kelowna announced that construction and planting work is now complete across a 650-metre stretch of the creek passing through Parkinson Recreation Park.
To support higher water flows, crews removed retaining walls, creek banks, and floodplain areas. The project naturalized stream elements by adding spawning gravel, deeper pools, riffles, wood, and new wetland habitat tailored for amphibians and turtles. Near the restored channel, nearly 780 trees along with 6,400 shrubs and grasses were planted.
Collaborative Effort and Wildlife Recovery
The project included collaboration with the Westbank First Nation and the Okanagan Nation Alliance. Staff from both nations assisted in shaping a dedicated community gathering area, selecting preferred plants, and deepening the understanding of environmental flows and fish spawning.
“The City engaged a number of biologists to support wildlife assessments and fish salvage throughout construction. Early signs of recovery have already been visible as salmon returned to spawn in the restored section within weeks of water flowing through the new channel this fall,” according to a press release from the City of Kelowna.
Infrastructure and Flood Mitigation Benefits
The broader Mill Creek Flood Protection project receives partial funding via a $22 million contribution from the federal government. City officials emphasized the multi-purpose design of the updated waterway.
“Mill Creek is a great example of infrastructure that does more than one job, reducing flood risk for nearby homes, businesses and public facilities – all while improving water quality for the stream and lake and bringing natural habitat back to the heart of our city,” said Mac Logan, general manager of infrastructure.
Rod MacLean, utility operations department manager, noted the functional improvements of expanding the creek’s reach. “Giving Mill Creek room to spread out onto its floodplain means it can safely route the high spring freshets, while naturalizing creek elements to allow for better water quality and fish spawning conditions,” MacLean said. “It’s satisfying to see the creek already working the way it should.”
The restored section will remain closed to the public until the new year so the newly planted vegetation can establish growth.
BC STORIES
Highland Valley Copper Strike Escalates as BC Federation of Labour Issues Hot Edict
BCFED has issued a hot edict urging unions not to handle Highland Valley Copper products as the USW strike against Teck Resources near Logan Lake escalates.
Labour Federation Directs Union Members to Block Mine Products
In response to an ongoing strike at Canada’s largest open-pit copper mine, the BC Federation of Labour has directed affiliated unions and members to cease handling mineral products and by-products tied to Highland Valley Copper. The hot edict, announced by the central labour organization, specifically targets copper and molybdenum concentrates from the Logan Lake area site to apply financial pressure on owner Teck Resources.
BCFED President Sussanne Skidmore described the move as an extraordinary measure, stating that the employer appears to believe it can outlast striking workers and bypass both the dispute and provincial anti-scab legislation. Over 1,200 workers represented by United Steelworkers Local 7619 have been on strike since walking off the job on Oct. 24. Union members voted unanimously to strike two weeks after their previous five-year agreement expired on Sept. 30.
Dispute Focuses on Wages, Safety, and Working Conditions
The striking employees are seeking improvements in compensation, pension protections, and workplace health and safety. Additionally, USW Local 7619 is calling on Teck Resources to address challenges related to recruiting and keeping skilled staff at the operation. Scott Lunny, Western Canada Director for the United Steelworkers, pointed to the company’s recent financial results, criticizing Teck for seeking concessions while reporting strong profits rather than meeting wage and pension demands.
Teck Reports Higher Profits Amid Ongoing Mine Expansion
Despite the labour stoppage, Teck Resources indicated during its third-quarter conference call that annual production at the mine is anticipated to reach the upper end of its target. Driven by elevated copper and zinc prices, the company reported third-quarter profit attributable to shareholders of $1.59 billion, or $3.24 per diluted share, an increase from $281 million, or 57 cents per diluted share, during the same period last year.
Teck stated it has implemented contingency measures and noted that the strike’s impact on overall output will depend on its duration. The company expressed its commitment to reaching a fair and reasonable collective agreement that maintains operational viability. A major expansion project is currently underway at the site near Logan Lake to extend the mine’s lifespan from 2028 to 2046.
-
BC STORIES5 days agoCommunity Rallies to Secure Federal Protection for Historic O’Keefe Ranch
-
BC STORIES5 days agoWhy the B.C. NDP is forced to rebuild trust following a costly election loss
-
BC STORIES5 days agoHighland Valley Copper Workers Stand Firm as Strike Crosses One-Week Mark
-
BC STORIES4 days agoWhat to Expect as B.C. Prepares for Its First New Government in Nine Years
-
SPORTS5 days agoCanucks Surrender Third-Period Lead to Sharks in 3-2 Loss
-
NATIONAL STORIES6 days agoJudge Refuses Delay for Sackville Man Seeking MAID During Murder Sentencing
-
COMMUNITY4 days agoThe week ahead in West Coast: Mon 2 — Sun 8 November
-
OPINIONS6 days agoKelowna Centre’s 132-Vote Warning: Nobody Owns This Riding